Location |
Limited to access and site constraints can limit orientation and feasibility, heavy equipment not necessary. |
Limited to access and site constraints can effect function of necessary heavy equipment. |
Building is possible if access to site is permissible, largest equipment on-site is a vehicle and a bobcat. |
Timing |
Construction time can take anywhere from four weeks to four months and is contingent on footings and foundations. |
Construction time can be anywhere from 3 weeks to four months and is also contingent on concrete work. |
Average build time can range from 3 days to two months; these buildings can go up before and without concrete altogether. |
Cost per
sq. ft. |
Cost per sq. foot on this type of construction can range from $24.00 to $30.00 to $36.00 for a basic building. |
Cost per sq. foot can range from $18.00 to $26.00. |
Cost per sq. foot for this type of construction usually ranges between $10.00 to $16.00. |
Foundation |
Footings or foundation walls required. |
Footings or foundation walls required. |
None. |
Services included in cost |
Typically a Stick Frame Contractor will work from Engineered drawing of architectural drawing, adding to the cost of this type of construction.
|
Typically a Steel Frame Contractor will work from Engineered drawing of architectural drawing, adding to the cost of this type of construction. |
In house drawings, Estimates Permitting Inc., as a retail entity, we have the ability to provide pricing onto our building custom. |
Quality |
Varies by Contractor and the amount of work they have done. |
Varies by Contractor and the amount of work they have done. |
We always have an updated list of references available and several projects that can be inspected by our potential clients. |